Showing posts with label prediction. Show all posts
Showing posts with label prediction. Show all posts

Monday, January 10, 2011

General: About my 2009 prediction

In 2009 I predicted a change to 240 Volt power in the US to facilitate the large power demand for vehicle recharging.
At the 2011 CES in Las Vegas, General Electric had a stand showing their 'WattStation' charging a Chevrolet Volt.
The nice thing is that it is apparently a 240 Volt system :-)

AP writes "An attendee looks GE's new Residential WattStation plugged into a Chevrolet Volt electric car at the 2011 International Consumer Electronics Show January 8, 2011 in Las Vegas. The 240 volt Residential WattStation is intended to be installed at home and can charge a car in only 4-8 hours. The Residential WattStation will ship in the fall and is expected to retail for between UAD $1,000 to $1,500."

I have no idea what UAD are, but if they meant AUD then US is about the same.


Update: 20110119 -

The Register has an interesting story on the current (no pun intended) state of UK electric vehicle recharge infrastructure which has this interesting bit of information -

"... This is because e-car batteries can't be charged up at all quickly. Using a specialist 240V, 32-amp supply - representative of the sort of charging point that could be widespread very quickly, and the rating that its users' home charge points have - a Mini-E can recharge in 4½ hours. The maximum amperage it can take, according to the makers, is 48: thus the fastest it can possibly, theoretically be juiced up without damage is 3 hours. If the luckless Mini E driver is compelled to use a normal UK wall socket, it will take well in excess of 10 hours. ..."

The next paragraph dealing with the recharging of a Tesla Roadster is a bit of a horror story! It is well worth reading the whole article.

That's a lot of power to generate and distribute over a country to run a significant percentage of transport on electricity. I think that even the local distribution for that power will be at a lot more than 240V, probably with a small substation/transformer per cluster of recharge points.

Saturday, February 7, 2009

General: It's Prediction-Time!

It occurred to me today that now I don't do an email newsletter, I haven't made my New Year prediction this year.

Since we are already in February, I think it is appropriate to make a somewhat further-looking prediction than usual.

As you may know Copper is in seriously short supply world-wide. This has led to a lot of thefts of copper cable recently, sometimes attempted thefts of live cables worthy of Darwin Awards.

Simultaneously, our oil reserves are now on the downward side of 'peak-oil' and in any case we can't afford to burn carbon compounds and exacerbate Global Warming.

This inevitably means an ever more serious attempt to replace Internal Combustion Engines in vehicles with Electric Motors and some kind of electrical power storage.

Since putting new batteries in your vehicle every day is right out, a rechargeable power storage system is necessary and recharge-time is clearly a limiting factor if it can't be recharged in a reasonable time.

Eight hours is, in my opinion, the longest duration acceptable for recharging where a vehicle is used to it's maximum range/performance.
A vehicle that can be recharged in eight hours, adopted throughout a country clearly represents a massive load that cannot be easily distributed throughout the working day barring differences in time-zones.
The best that might be achieved is partial recharging whilst at work, but this is during the part of the day that industry makes it's heaviest demands of the power generating and distribution grid already.

With the current generation of electric vehicles, eight hours does indeed seem to be the best achievable recharge time BUT, this is on 110 Volt distribution outlets due to the limitations on maximum current. On 240 Volt outlets, this can be reduced strikingly to two and a half hours!

Once you can achieve a recharge in two and a half hours, you can also have a managed, phased recharge period in three or more 'shifts' to lighten the load on the power grid which saves building extra generating capacity just to recharge Electric Vehicles.

Given that copper house wiring may soon be impractical due to scarcity of copper, we can expect to see other materials used in this role. To achieve the same deliverable currents will require a moderate increase in wire size but to achieve a high enough current delivery for an electric vehicle revolution at 110 Volts would require a much larger diameter of wire and also present additional difficulties over those already present in working with conductors such as Aluminium.

An alternative would be to make ALL domestic 110 Volt mains three-phase, but this would have it's own complications of expensive re-work and materials as well as overcoming perceived safety issues with the higher phase to phase voltages.

For these reasons (Here comes the actual prediction!), I think it is extremely likely that within five years we will be hearing about the necessity of the USA adopting the 240 Volt standard to enable the Electric Vehicle solution to Oil shortages and Greenhouse Gases.

It is possible that in order to handle the recharging loads an even higher voltage could be chosen to reduce the cost of thicker conductors or to try and carry on with Copper conductors but of a lighter gauge. This would cost more in higher performance insulation and there would undoubtedly be a big panic about the safety aspects of voltages that are higher than any currently used. For these reasons I don't think a voltage greater than 240 Volts would be adopted.

Given the irresolute prevarication about switching to Digital TV (as if they will be any more ready in 4 months time), I can only guess what a mess the changeover to 240 Volts will be.

A sample Electric Vehicle (and a rather tasty one at that) with the recharging times documented.